The Indian Government’s launch of the ambitious Jawaharlal Nehru National Solar Mission(JNNSM) was done with much fanfare with a target of reaching 20 GW of Solar Capacity by 2022 under 3 phases from the 81 MW currently.While the government had the best intentions and had laid down a well defined 10 year plan with subsidy support for both Solar Thermal and Solar PV Technology,it has already run into problems.Due to high interest the government went in for bidding of projects which led to irrationally low bidding from unknown firms.This has put the entire exercise in question with the the biggest private utility saying JNNSM is a failure.Without extensions of deadlines it looks highly unlikely whether the 37 winners will actually put up the plants.
JNNSM is divided into 3 phases with the ultimate goal of reaching grid parity with coal by 2030.I don’t know where they came with the 2030 figure as I think solar should reach grid parity much earlier and should be below coal cost much before
1)Phase I (up to 2012/2013) – remaining period of 11th five yr plan & first yr of 12th yr plan Target of 1100 MW
2) Phase II (2013-2017) – remaining 4 yrs of 12th five yr plan Target of 3000-10000 MW
3) Phase III (2017-2022) – 13th five yr plan 20000 GW overall
The Objectives of the Solar Mission
1) Solar Lighting-Deploy 20 million solar lighting systems for rural areas
2) Solar Heaters – Achieve 15 million sq. meters by 2017 & 20 million by -2022 of solar thermal collector area
3) Solar Manufacturing – Global Leader in Solar Manufacturing ( Seems a Pipe Dream right now) with Targets 4-5 GW equivalent of installed capacity by 2020 including setting up of dedicated manufacturing capacities for poly silicon material to annually make about 2 GW capacity of solar cells
4) Off Grid Solar Applications – Solar Mission has set a target of 1000 MW by 2017
Funding of the JNNSM will be done by
1) Renewable Energy Credits (REC) – State Electricity Regulatory Commissions (SERC) to fix a minimum
percentage of energy purchase from renewable sources of energy
2) NTPC’s Trading Arm NTPC Vidyut Vyapar Nigam Ltd ) is chosen as the nodal agency for entering into a Power Purchase Agreement (PPA) with solar power developers.NTPC will mix expensive solar power with cheaper coal power .
3) Incentives
First Phase (How it has fared so far)
Smaller 2 MW PV Projects
India has set a target of 1100 MW for the first phase with around 100 MW allocated for 2 MW projects which have the best chance of being built.Note the 2 MW project winners are already flipping the projects as many non-serious players won the projects.These companies were speculators and has no intention of building the plants anyway
Transfer Projects
It has also allowed 80 MW projects to be transferred to JNNSM rate which has led to strong state objections.The State nodal agencies have also started objecting to the tariff policy as 80 MW of Solar Projects were awarded the base FIT of Rs 17.91 as they were transferred to the Indian Federal Subsidy from their initial PPAs with individual states.Note these solar project developers who have managed to get transferred will get tariffs which are almost 60% higher than the lowest bidder for the 5 MW Solar Project at Rs 10.95.This will also mean a much large taxpayer outgo to the 16 Project Winners for the 80 MW than for the 150 MW projects
Larger PV 5 Projects and Bigger Solar Thermal Plants
The rest of the 620 MW projects are in serious trouble with no major construction happening.The developers might find it profitable to lose their deposit money rather than building the plant.The government will have to potentially bailout these companies if it wants to see its Solar Mission be successful.While the first phase is already in trouble the government is already thinking of auctioning another 296 MW of solar projects in April.Don’t know how that will help as the majority of the First Phase projects are already in trouble
SUMMARY
The First Phase of the JNNSM has not inspired much confidence and compared to successful programs in Germany seems a total failure.State Governments like Gujarat and Rajasthan are pushing solar energy much better than the Federal Government.The fast declining costs of solar energy IMHO will pretty much make this policy obsolete anyway in a couple of years.
Author Links on JNNSM
12 Comments
[…] Government has already given it a strong push targeting 1000 MW by 2013 and 20 GW by 2022 under the JNSSM.While the Subsidy Program is facing some initial hurdles due to debt financing and aggressive […]
Dear Sir/Ma’m
iI want to get some other detail regarding Solar energy power.because I m meneger of Rural develop in NGO at sabarkatha district in Gujarat and want to join your project.
Regards
Bharat Trivedi
What are the details that you want to know about?
[…] will not use the discredited reverse auction bidding mechanism being used in the First Phase of the JNNSM Federal Solar Subsidy Policy.The reverse auction bidding was done due to the massive deluge of […]
[…] 22 GW solar capacity target by 2022 which rivals that of China.However the first phase of the JNNSM has mainly given subsidies and incentives to large megawatt solar installations which are to be […]
sir,
we intend to set up a manufacturing unit of solar water heaters, where we shall be importing a few components. What kind of financial support can we get from various govt. agencies, at what kind of rate of interest, weather loan will be non-colateral, what is the concession we get on excise duty and custom duty/
Please guide.
Rajesh Dhingra
Mr Dhingra
Please read this post http://greenworldinvestor.com/2011/04/16/solar-water-heaters-in-india-understanding-benefitscostsubsidies-for-buying-solar-heaters-swh-manufacturers-list/ ,Also look at the MNRE website for further details
Abhishek
[…] not have such a policy though it has put in a domestic content requirement for solar projects under JNNSM.This does not apply to thin film technology yet but First Solar may be looking to preempt this by […]
[…] generating huge excitement with falling prices of Solar Power and government incentives under the JNNSM.However Subsidy of Home and Small Commercial Solar Energy Systems has not been big enough.Unlike […]
sir,
I am Gwangphun from Nagaland. I am seeking a detail information is to how we may access the privilege to avail the project under your scheme. I shall be grateful to you if you could reach out to me personally with your needed help and guidance.
Yours sincerely
Gwangphun
8974381932
hello guy’s i need some info about solar water heater subsidy .
what is the process how many percentage subsidy and targen and more …
Thanks in Advance
sir,
I am mechanical engineer,I am working in cogen manufacturing company as a deputy manager [erection dept]. I am intrested in solar water pumps for agriculture purpose.So I need full details where to purchase,how to purchase and what type of subsidy I shall got from govt.
Anand Dafedar
KARNATAKA